Knitting wise, I finished 29 things.

At the end of the year, I was left with 14 knitting WIPs which is really quite a lot. On a slightly better note, only 3 of those WIPs were started before the start of 2009. Quite a few of the WIPs are nearly done so hopefully 2010 will see some early finishes.
Stitching wise, I didn't do well at all. I started 2009 in a bit of a stitching slump which has continue for most of 2009. although I've been stitching more in the past 6 months. I managed 16 finishes of mostly small things. This has left me with 37 stitching WIPs, 30 of which were started before 2009.

My plans for 2010 are fairly simple. I want to enjoy my knitting and stitching. Ideally I want to get the number of WIPs down a bit. 2010 is going to be a year of stash reduction for me. I have a lot of yarn and stitching materials and I would like to reduce the size of the stash. However I'm pretty realistic about my will power so the plan is to make sure that I use more yarn and stitching supplies than I buy.