Showing posts with label progress. Show all posts
Showing posts with label progress. Show all posts

Friday, January 01, 2010

2009 crafty summary and 2010 plans

Well I guess that is 2009 over. In 2009, I've not managed as much knitting and stitching progress as I thought I would. I am, however, quite pleased with what I've achieved.

Knitting wise, I finished 29 things.

2009 Finishes

At the end of the year, I was left with 14 knitting WIPs which is really quite a lot. On a slightly better note, only 3 of those WIPs were started before the start of 2009. Quite a few of the WIPs are nearly done so hopefully 2010 will see some early finishes.

Stitching wise, I didn't do well at all. I started 2009 in a bit of a stitching slump which has continue for most of 2009. although I've been stitching more in the past 6 months. I managed 16 finishes of mostly small things. This has left me with 37 stitching WIPs, 30 of which were started before 2009.

Stitching finishes 2009

My plans for 2010 are fairly simple. I want to enjoy my knitting and stitching. Ideally I want to get the number of WIPs down a bit. 2010 is going to be a year of stash reduction for me. I have a lot of yarn and stitching materials and I would like to reduce the size of the stash. However I'm pretty realistic about my will power so the plan is to make sure that I use more yarn and stitching supplies than I buy.

Monday, May 11, 2009

May Monday progress

This past weekend has been a lovely time of rest and relaxation after a very stressful week at work. I've cooked myself some lovely food - Asparagus cannelloni due to the bargain aisle at Tesco and then couscous, pittas and houmous yesterday. Having time off also meant I got some stitching and knitting time in.

Yesterday I got some stitching time in Autumn watergarden, which I've fallen behind with a little. I've now managed to get part 1 finished, beading and all and got a fairly good start on part 2.

Autumn watergarden pic 3

I've also been stitching on my part of the group wallhanging that I'm part of and that's almost done too.

Knitting wise, I've been knitting on a couple of pairs of socks. First up, the Socktopus club socks from last month's parcel have made some progress. The people in my knitting group have heard my frustrations with these socks at the last meetup I made it too as I was having problems with one of the pattern lines that was in turn causing problems with the stitch count. It turns out that one of the written pattern repeats had an extra yarn over in it but the chart didn't. I had been using the written pattern, hence my problem. After getting over this, I made quicker progress. The first sock is knitted and I'm now on to the icord embellishments of that sock.

Over the garden wall wip pic2

Whilst I was really frustrated by the problems of that sock, I cast on the first of a pair of socks from the new Cookie A book - Kai-Mei in Malabrigo sock in Lettuce.


Kai mei wip

I have done a little yarn buying over the weekend though. I've been trying to find a little cardigan to go with my dress without luck. I did, however manage to find the right colour of cotton yarn to knit one so hopefully with a firm deadline, I hopefully should get it done. The yarn is Drops safran and I'm planning to use the pattern Marigold from Rowan 45.


Drops Safran sh 51

Friday, April 03, 2009

A variety of finishes and some progress pictures

I've been catching up this evening with some of the things I've been making lately. First up, a finish from last month, Violets by Shepherd's bush. I'm not sure as yet how I'm going to finish it.

Violets

At the weekend, I made one of my previous finishes into a biscornu. The design is a freebie that I got with a package of Dinky dye fibres from West End embroidery at the Harrogate show a couple of years ago.

Dinky dyes biscornu

A couple of weekends ago, I made my first visit to a new and very lovely bead shop that has opened in Glasgow along with a couple of people from my knitting group. Its a fabulous shop and I'm planning a return visit soon. Whilst I was there, I picked up some purple beads that I've made into elasticated bracelet. You can see two of them below.

Purple beaded bracelets

Whilst I was there, I also bought a watch face, some glass beads and silver spacers that became this watch and bracelet set. Its a slightly late Mother's day present for my mum which I hope she like. She doesn't read my blog so its safe to share here.

Beaded watch and bracelet

In my goals post, I mentioned that I've made some progress on Autumn watergarden and Japanese Octagon box so I thought I'd share some progress pictures. I'm enjoying my stitching again thankfully.

Autumn watergarden pic 2

Japanese octagon box pic 3

Not much else going on here. I'm working this weekend on night shift then flipping back on to day shift on Tuesday, which I am very unimpressed about but I'm off work the following week. On Wednesday, I saw my GP and I've got sinusitis, which would account for the facial pain and general washed out feeling I've had lately. I have some antibiotics to take which are making me feel pretty sick but at least they are helping.

Thursday, April 02, 2009

March progress and April goals

For March I hoped I would

1. Finish my Central Park Hoodie - I only have a little bit of each sleeve, the hood and the button bands to do so its achievable - Yay I managed this as you can see from the last post

2. Finish one pair of socks currently on the needles - again achievable as I'm on the second sock of one pair - Again I managed this as per my last post.

3. Stitch at least the first part of Autumn Watergarden - Not quite but I made some progress.

4. Finish stitching the box side of Japanese Octagon box and make a start on at least one more section - Well I've almost finished the box side.

In addition I managed to start and finish Violets by Shepherd's bush and make a previous finish into a biscornu. I've also been doing a little beading of some bracelets and a watch strap.


For April I plan to

1. Finish a Lacy cardigan that I'm currently knitting. I've only got the sleeves to go.

2. Finish at least one pair of socks

3. Start and finish my Socktopus April sock club socks once they arrive.

4. Finish at least part 1 of Autumn Watergarden and try to finish part 2.

5. Finish the box side of Japanese Octagon box and start the next part.

6. Stitch my part of a group wall hanging project that I'm part of.